“Optimizing Production Scheduling With the Spotted Hyena Algorithm: A Novel Approach to the Flow Shop Problem”. Reports in Mechanical Engineering 4, no. 1 (July 16, 2023): 90–103. Accessed November 23, 2024. https://rme-journal.org/index.php/asd/article/view/98.