“Optimizing Production Scheduling With the Spotted Hyena Algorithm: A Novel Approach to the Flow Shop Problem”. Reports in Mechanical Engineering, vol. 4, no. 1, July 2023, pp. 90-103, https://doi.org/10.31181/rme040116072023m.